Archived version · 2026-05-11
State at the H4-verdicts deploy, before the H14/H15 verdicts closed the extended-research directions: H4 topology-aware portfolio construction had PASSED at corpus scale (the headline practical result, +4.79 Sortino vs HRP, ~54 % smaller drawdown, only −0.4 % shift under the lookahead-feature retirement); H13/H16 had landed MARGINAL and H17 PASS; the lookahead-feature retirement audit had closed with the two-class finding; six new figures had been added (19 total). The central-claim text led with H4 PASS but had not yet promoted the prediction-vs-decision partition as the program's central finding, and Phase 06 was still the generic 'practitioner workflow' phase (the Deployment Stack had not been specified).
This is a summary of what the topology-roadmap page was at this version, not a full visual snapshot. The live page has since moved on; the changelog index lists every version, and the live page is always the current state.
What this version was
- Phase 05 marked FINISHED with H4 PASS at corpus scale; Phase 07 marked in-progress (three of six landed: H17 PASS, H13/H16 marginal); H12/H14/H15 still listed as pending.
- Six new figures embedded (H4 forest plot, H4 drawdown box, H13 two-panel, H16 quality-aware-vs-blind bars, H17 lollipop, the two-class partition figure), 19 figures total.
- Dek and central-claim text led with H4 PASS; claim (b) (better drawdown profiles than HRP/NCO) stated as supported at corpus scale.
- Phase 06 still listed as 'practitioner workflow & live deployment' with a generic CLI-surface list; the Topology Deployment Stack and H18/H19 had not been specified; output portfolio was seven papers.
- Last-updated label moved to 2026-05-11; this version's changelog entry had no archive route file (404 on click).

