Back to changelog

Archived version · 2026-05-11

State immediately before the four corpus verdicts: H3 make-or-break had just failed and the program was reframing around what survives. Phase 05 (H4 portfolio construction) was elevated to next-active but not yet run; the six Phase-07 extension hypotheses (H12–H17) were all still planned. The lookahead-feature retirement had landed on the figures but its program-wide audit conclusions were not yet integrated into the page copy.

This is a summary of what the topology-roadmap page was at this version, not a full visual snapshot. The live page has since moved on; the changelog index lists every version, and the live page is always the current state.

What this version was

  • Phase 05 listed as the program's highest-EV remaining test, next-active, not yet started.
  • Phase 07 listed all six extension hypotheses (H12–H17) as planned; none had a verdict.
  • The central-claim text said claim (a) was falsified and the program was reframed around the surviving claims (b)/(c)/(d) plus the six new directions, claim (b) was a hope, not yet a result.
  • Findings section carried six entries (smooth manifold, H1 PASS, H2 falsification, H3 falsification, fingerprint feature importance, the per-feature breakdown); 13 real-output renders embedded.
  • Dek read "the make-or-break test (H3) just landed, and it failed; the program is reframing".
Topology roadmap, archived version 2026-05-11 | Daru Finance